While the capabilities of the company are geared to meet the requirements of the customer, Stroynovatsya is adept in providing and carrying out all facility works on “turn-key” basis or propose solutions for the whole work cycle of the Project, keeping in mind both “price and quality.”

Stroynovatsiya’s main business activities are construction, project, erection, repair and commissioning works. It offers a full range of services including engineering surveys, designing, field designing and “as built” documentation. The company was established in 2003 for implementation of construction projects in oil and gas industry.

The company is a leader in building crude oil loading terminals, trunk oil and gas pipelines, tank farms, pumping and compressor stations and repair of corrosive coating of oil and gas pipelines and tanks.

Stroynovatsiya is a vertically-integrated holding with high dynamics of work scope growth. It has all necessary resources including an extensive network of owned construction, design and manufacturing companies which enables Stroynovatsiya to act efficiently, providing timely and quality work performance in any regions of Russia and abroad.

The strategy of the company is based on the comprehensive approach to business activity and cooperation with clients, combination of strategic understanding of market development, work rate and quality, business-processes optimization, cost reduction, performance time, use of state-of-the-art technologies and increase in service quality level.

The available capabilities allow us to perform the large work scope with own resources and build the oil and gas facilities as EPC-contractor. The company offers reliable cost-effective, state-of-the-art solutions that help their clients expand their business activity.
 
Projects under implementation:

Second phase of construction of transportation system: Eastern Siberia-Pacific Ocean (ESPO-2). Full range of construction and installation works on the linear part of the pipeline with total length of 602 km and 3 pump stations.

Second phase of construction of Baltic Pipeline System (BPS-2): Construction of linear part sections of the pipeline D 1067 mm, with total length of 353 km.

Reconstruction and construction of the CPC pipeline system facilities. Full range of construction and installation works on reconstruction of 1 pump station and construction of 4 new pump stations.