PetroRabigh said in a statement that the complex would be running at full capacity by Aug. 15. The restart of the 92,000 barrels-per-day (bpd) high olefin fluid catalytic cracking unit (HOFCC) had been delayed from mid-July as more maintenance work was needed at the unit’s fractionator, prompting Aramco to sell fuel oil cargoes and boost gasoline imports.A crude distillation unit (CDU) at the 400,000 bpd refinery integrated with the petrochemical complex is back online, the firm, a joint venture between Saudi Aramco and Japan’s Sumitomo Chemical, said earlier this month.